Home / Hardened drums

Concrete set up in the drum

Sell a Mixer With a Hardened Drum

A load set up in the drum feels like the end of the truck. It isn't the end of a sale. We buy it as it sits.

Close view of an old rusted mixer drum on a truck parked under trees
Set drums welcomeHeavy tow arranged

Pour slip · Free offer, no obligation

Get your concrete truck offer

About a minute. We call back with a number.

Type of truck
Does it run?

Who do we call?

Add drum load, year or email (optional)

Or call 236-239-0420

Your details are only used to quote this truck.

  • Partly or fully set
  • No chipping out first
  • Heavy tow planned for the weight

How it happens

The usual reasons

  • A breakdown mid-delivery, with a full load.
  • A dead drum drive on a hot day.
  • A truck parked without a full washout.
  • Build-up over years of small leftovers.
Green and white mixer truck seen from behind at a job site with a worker by the chute
A mixer at the pour. Chutes, fins and drums all wear.

What we need to know

Before we come

How full?

A rough guess is fine: a little, half, most.

Does it run?

Driving changes the plan.

Tires and brakes

Flats or locked brakes change the tow.

Where it sits

Yard, site or roadside.

Mixer parked for good? Get a number in minutes.

Don't climb in

Breaking out a set drum is confined-space work. You don't need to do it to sell the truck to us.

Before pickup

What to tell us about a set-up drum

  • Roughly how full the drum is
  • Whether the drum turns at all
  • Whether the truck runs
  • How long the load has been in there
Old rusty yellow concrete mixer truck parked on weedy ground
An old mixer parked for good. Trucks like this are what we buy.

Hardened drums in depth

What happens with a hardened drum

It's one of the most common reasons a mixer ends up for sale.

How it happens

A breakdown on the way to a pour, a missed wash-out at the end of the day or a load that sat too long can set up inside the drum. Once concrete hardens, the drum can't turn it out, and the truck is parked. It happens to careful operators too.

Why it's costly

Chipping out set concrete takes time, equipment and a trained crew. The work can damage the fins and shell, and it is dangerous: WorkSafeBC's confined space and lockout rules apply to anyone working inside a drum. That cost is why many owners sell the truck as it sits.

Weight

A drum full of hardened concrete adds a lot of weight, and the weight sits high on the truck. That changes how the truck can be towed or loaded and can push it past the limits of some equipment. Tell us roughly how full the drum is so we can plan the right truck.

Selling as is

We buy mixers with hardened drums as they sit. Tell us roughly how full the drum is, whether the drum still turns at all and whether the truck runs. The figure reflects the cost of dealing with the concrete, but the chassis, the drivetrain and the steel still count.

Drum removal

Sometimes the drum is taken off at the yard and handled separately from the truck. The drum with its concrete is cut or broken up, and the chassis is sold for parts or reused under another drum. That's our job after pickup. You don't need to do anything to the drum first.

Photos

A photo looking into the drum opening shows us how much material is in there. Add photos of both sides of the truck, the engine and the odometer. If the truck has sat for a while, tell us how long and whether anyone has tried to break the load out.

Partly hardened loads

A drum with a partial set-up, like a buildup on the fins or a slug at the bottom, is common and often less of a problem than it looks. Tell us whether the drum still turns. A drum that turns with a buildup inside is priced very differently from one that is full and locked.

Don't run water in a hardened drum

Adding water or trying to spin a hardened drum can damage the drum drive and create alkaline runoff. If the load has set, leave it. Keep the truck parked where it is, and tell us about any wash water or slurry that is already in or around the truck.

Insurance and breakdowns

If the load hardened after a breakdown or a collision, an insurer may be involved. Tell us who owns the truck now and whether a claim is open. Sometimes the insurer decides what happens to the truck, and we can work with them.

Questions

Common questions

Is a mixer with a full set drum worth anything?

Yes. The chassis, the drum steel and working parts still have value, even with the load inside.

Why does the fill level matter?

Set concrete is heavy. The fill level decides which tow truck can move it safely.

Should I try to break it out first?

No. It's dangerous confined-space work and you don't need to do it to sell to us.

Can you take a mixer with concrete set in the chute too?

Yes. Set concrete in the chute and hopper is common on parked mixers. It adds weight, which is part of how we price the truck.

Does a set drum change how the truck is moved?

Yes. A full or partly full drum is very heavy, so we use a heavy tow and plan the route. Tell us roughly how full the drum is.

Is it worth breaking the concrete out before selling?

Usually not. Chipping out a set drum is slow and expensive, and it rarely raises the offer enough to cover the cost. We price the truck as it is.

Drum set up solid?

Tell us roughly how full and send photos. We'll plan it.